![]() |
customer@davidpublishing.com |
![]() |
3275638434 |
![]() |
![]() |
| Paper Publishing WeChat |
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License
Steel Bridge Design in Harmony with Concrete in Recent Korea
Woo-jong Kim
Full-Text PDF
XML 147 Views
DOI:10.17265/1934-7359/2026.08.005
P.E., Ph.D., Head Engineer of DM Engineering Co., Ltd., Seoul 05288, Korea
Steel and concrete are typical materials for bridge construction. Both materials have their own characteristics such as strength, weight and material cost, installation cost and speed, and durability. Bridge design engineers always compare these two materials, and they spend a lot of time and research to optimize the use of both materials. In many cases, optimum results can be obtained when properly mixing steel and concrete. In this paper, I will look at several bridges recently designed and constructed in Korea using steel and concrete in harmony. It also explores how the steel and concrete are mixed in the bridges, and what are the advantages of using them.
Steel
bridge design, composite bridge, hybrid
bridges, bridge design in harmony, cable-stayed bridge,
extra-dosed bridge, skyline study, different materials, UHPC (Ultra-High
Performance Concrete).
Woo-jong Kim. (2026). Steel Bridge Design in Harmony with Concrete in Recent Korea, Journal of Civil Engineering and Architecture, August 2026, Vol. 20, No. 8, 359-366
[1] Hyundai Engineering & Construction. 2016. The Design Report for Damyang-Sungsan 88-6 Highway Construction (Korean), Korean Highway Cooperation.
[2] Deawoo Engineering & Construction. 2010. The Design Report for Aphae-Amtae Roadway Construction (Korean), Jeollanam-do Provincial Government.
[3] Daelim Industrial. 2011. The Design Report for Poseung-Pyoungtack Railway Construction (Korean), Korean Rail Network Authority.
[4] Daelim Industrial. 2012. The Design Report for Hoseoung-songsan 5 Seohae-line Railway Construction (Korean), Korean Rail Network Authority.
[5] Daelim Industrial, Ltd. 2013. The Design Report for Dodam-Youngchun 6 Jungang-line Railway Construction (Korean), Korean Rail Network Authority.
[6] Home-Page of DM Engineering Co., Ltd. 2019. www@dm-eng.com.



