Paper Status Tracking
Contact us
[email protected]
Click here to send a message to me 3275638434
Paper Publishing WeChat

Article
Affiliation(s)

International Transportation Asset Management Specialists (ITAMSs), Cairo, Egypt

ABSTRACT

PBMC (performance-based maintenance contracts) provides incentives and/or disincentives to the contractor to achieve desired outcomes or results. In other words, the concept of PBMC is to pay a contractor based on the actual results (performance or LOS (level of service)), not on the performed work. PBMC does not detail to the contractor how, when, or where to do the work. Instead, it specifies performance standards or targets for measurable outcomes and sometimes outputs. There are several benefits from implementing PBMC. Higher LOS, i.e., better quality, potential reduction in agency costs and downsized maintenance workforce are among these benefits. Also, there are several challenges facing the implementation of PBMC. One of the most complex challenges that relates to both the agency and contractor, and in some cases to the public, is how to manage LOS in an objective manner and to demonstrate that policy goals and objectives regarding quality of life expectancy are achieved without any increase in the LCC (life cycle cost) of the assets. This challenge, along with many other challenges, can be addressed through the adoption of an AM (asset management) approach. AM approach facilitates the long-term planning based on the current and future conditions and desired LOS. In addition, AM provides the necessary tools to objectively monitor LOS, and hence the contractor performance, which will contribute to the success of the implementation of PBMC. 

KEYWORDS

Transportation project, maintenance, PBMC.

Cite this paper

References

[1]   Lowry, J. M. 2007. U.S. 550 Warranty Program. Santa Fe: New Mexico Department of Transportation.

[2]   Stankevich, N., Qureshi, N., and Queiroz, C. 2006. Resource Guide, Performance-Based Contracting for Preservation and Improvement of Road Assets. Washington, D.C.: World Bank.

[3]   Stankevich, N., Qureshi, N., and Queiroz, C. 2005. Performance-Based Contracting for Preservation and Improvement of Road Assets. Transport Note No. TN-27. Washington, D.C.: World Bank.

[4]   Pakkala, P. 2007. “Survey of International Contract Maintenance.” Presented at the 86th Annual Meeting of the Transportation Research Board, Washington, D.C., USA.

[5]   Hardy, P. 2001. “Austroads Review of Performance Contracts: The Potential Benefits of Performance Contracts.” Presented at Contracting the Future NZIHT Symposium.

[6]   Pakkala, P. 2002. Innovative Project Delivery Methods for Infrastructure: An International Perspective. Helsinki: Finnish Road Enterprise.

[7]   AASHTO. 2002. Transportation Asset Management Guide. NCHRP Project 20-24(11), Washington, DC.

[8]   Sharaf, E., and Zaghloul, S. 1987. “Issues in the Development of Pavement Management System in Egypt.” In Proceedings of the Second North American Conference on Managing Pavements (Vol. 1), Toronto, ON.

[9]   Zaghloul, S. 1988. “Development and Applications of Pavement Management Information System in Egypt.” M.Sc. thesis, Cairo University.

[10]  Zaghloul, S., and Sharaf, E. 1989. “A Simplified Pavement Maintenance Cost Model.” In Transportation Research Record: Journal of the Transportation Research Board, No. 1216, TRB, National Research Council, Washington, D.C.

[11]  Zaghloul, S. 1997. “Development of Performance Based Quality Control Specifications for Asphalt Pavements.” In Proceedings of 5th International Rilem Symposium on Mechanical Test for Bituminous Mixes, Lyon, France.

[12]  Zaghloul, S., Saeed, N. A., Al Jassim, A., and Rafi, A. M. 1998. “End-Result Specifications for Warranted Asphalt Pavements.” In Transportation Research Record: Journal of the Transportation Research Board, No. 1632, TRB, National Research Council, Washington, D.C.

[13]  Zaghloul, S. 2007. “Development of Objective Payment Adjustment Criteria for Nova Scotia.” In Proceedings of Annual Conference of the Transportation Association of Canada (TAC), Saskatoon, SK.

[14]  Landers, S., Zaghloul, S., Cowe-Falls, L., and Cheetham, A. 2002. “Development and Calibration of a Pavement Surface Performance Measure and Prediction Models for the British Columbia Pavement Management System.” Presented at Annual Conference and Exhibition of the Transportation Association of Canada, Winnipeg, MB.

[15]  Zaghloul, S., He, Z. W., and Vitillo, N. 1998. “Project Scoping Using FWD Testing—New Jersey Experience.” In Transportation Research Record: Journal of the Transportation Research Board, No. 1643, TRB, National Research Council, Washington, D.C., pp. 34-43.

[16]  Transportation Research Board (TRB). 2006. Performance Measures and Targets for Transportation Asset Management. Project 20-60, National Cooperative Highway Research Program (NCHRP), Report 551. Washington, D.C.: Transportation Research Board (TRB).

[17]  Zaghloul, S., Chowdhury, T., and Holland, T. J. 2008. “Enhancing Pavement Management System Analyses through Consideration of Construction Quality.” Presented at 87th Annual Meeting of the Transportation Research Board (TRB), Washington, D.C.

[18]  ASTM E1926-08. 2008. Standard Practice for Computing International Roughness Index of Roads from Longitudinal Profile Measurements. Conshohocken: ASTM International.

[19]  Zaghloul, S., and Holland, T. J. 2008. “Comparative Analysis of Long-Term Field Performance of Recycled Asphalt in California Environmental Zones.” Presented at 87th Annual Meeting of the Transportation Research Board (TRB), Washington, D.C.

[20]  Zaghloul, S., Marukic, I., Ahmed, Z., Vitillo, N., Sauber, R., and Jumikis, A. 2004. “Development of Network-Level Structural Adequacy Index Model for New Jersey Department of Transportation Pavement Management System.” Presented at 83rd Annual Meeting of the Transportation Research Board (TRB), Washington, D.C.

[21]  ASTM E1960-07. 2008. Standard Practice for Calculating International Friction Index of a Pavement Surface. Conshohocken: ASTM International.

[22]  Thompson, P. D., and Shepard, R. W. 2000. “AASHTO Commonly-Recognized Bridge Elements.” Presented at National Workshop on Commonly Recognized Measures for Maintenance, Scottsdale, Ariz, USA.

[23]  Malloy, A., Hale, D. P., and Sharpe, S. 2004. “Web-Enabled Bridge Sufficiency Calculator.” University Transportation Center for Alabama, USA.

[24]  FHWA. 1995. Recording and Coding Guide for the Structure Inventory and Appraisal of the Nation’s Bridges. USA: FHWA.

[25]  Zaghloul, S., Helali, K., Ahmed, Z., Sauber, R., and Jumikis, A. 2006. “Cash Flow Control of New Jersey Interstate Needs.” In Transportation Research Record: Journal of the Transportation Research Board, No. 1974, TRB, National Research Council, Washington, D.C., pp. 54-62.

About | Terms & Conditions | Issue | Privacy | Contact us
Copyright © 2001 - David Publishing Company All rights reserved, www.davidpublisher.com
3 Germay Dr., Unit 4 #4651, Wilmington DE 19804; Tel: 001-302-3943358 Email: [email protected]