Faculty of Engineering, Islamic University, Gaza 00972, Palestine

ABSTRACT

A cost estimate is one of the most important steps in road project management. There are ranges of factors that mostly affect the final project cost. Many approaches were used to estimate project cost, which took into consideration probable project performance and risks. The aim is to improve the ability of construction managers to predict a parametric cost estimate for road projects using SVM (support vector machine). The work is based on collecting historical road executed cases. The 12 factors were identified to be the most important factors affecting the cost-estimating model. A total of 70 case studies from historical data were divided randomly into three sets: training set includes 60 cases, cross validation set includes three cases and testing set includes seven cases. The built model was successfully able to predict project cost to the AP (accuracy performance) of 95%.

KEYWORDS

 

Cite this paper

References

About | Terms & Conditions | Issue | Privacy | Contact us
Copyright © 2001 - David Publishing Company All rights reserved, www.davidpublisher.com
3 Germay Dr., Unit 4 #4651, Wilmington DE 19804; Tel: 001-302-3943358 Email: [email protected]